ROOTS FINISHED BASEMENTS 435.677.6050
Roots— Finished Basements —

The last week of the build

Basement flooring, vinyl plank, carpet and tile

Flooring goes in last, after paint, so nothing has to be protected. Vinyl plank in the living areas, carpet in the bedrooms, tile in the bath, matched to what is upstairs.

7 to 8 week finish, in your contractEvery line pricedFinishes matched to upstairsLicence 14282096-5501

Luxury vinyl plank is the usual choice for basement living spaces because it handles concrete and the occasional spill. Carpet makes bedrooms and theaters quieter and warmer. Tile goes in the bathroom. We match the flooring upstairs where it makes sense and bring samples where it does not. Flooring is itemized by room on the proposal.

What is included

  • Luxury vinyl plank in living areas, kitchenette and hallways
  • Carpet and pad in bedrooms and theater
  • Tile in the bathroom and at the kitchenette
  • Floor prep on the concrete before anything goes down
  • Transitions and base matched to upstairs
  • Installed after paint, before the final walkthrough

How Roots does it

Basement with wood-look vinyl plank floor and shiplap wall
01

Vinyl plank that matches upstairs

The same look as the main floor, built for a basement.

Basement living room with vinyl plank floor and area rug
02

Living areas

Plank in the open rooms, carpet in the bedrooms, tile in the bath. Itemized by room.

What it costs

Flooring is itemized by room and material on your proposal. Vinyl plank and carpet are the value choices; hardwood and large format tile cost more. Changing a room from carpet to plank is a line change, written up before the work.

Other services on the same contract

Questions about basement flooring installation

Can you put hardwood in a basement?

Engineered hardwood, yes, with the right prep. Solid hardwood is not recommended on concrete. We explain the options on the first visit.

Do you match the flooring upstairs?

Where it makes sense. Many main floor products have a basement-suitable version in the same color.

When does flooring go in?

The last week, after paint and before doors and base are set.

Book a walkthrough. One visit, then a line item price and a finish date in writing. You decide after you have both.

Call 435.677.6050